Architecture and engineering Andorra news
01/09/2020
New deviation in Sant Julià de Lòria
Aerial view of the deviation
The Sant Julià de Lòria Deviation project: Section between the E2 link and the Connection Bridge with the CG1, aims to build the new diversion of the CG1, on the right bank of the river Valira, between the junction of Fontaneda and the bridge of Carrer Isidre Valls, in Sant Julià de Lòria.