Architecture projects: Avant projecte de centre de submarinisme en alta muntanya

Private Equipment


Place:

Escaldes-Engordany (Principat d'Andorra)


Date: 2009 - 2010
Avant projecte de centre de submarinisme en alta muntanya, Architecture (Principality of Andorra)

Avant projecte de centre de submarinisme en alta muntanya

The dive center of Andorra "Andorra Diving - diving in the mountains" asked to perform a project for future facilities.

This proposal as a first draft, shows risky but powerful, in terms of distribution and architectural design.

Following a well-defined lines we obtain a simple but dynamic in qual different units are located www.plastival.com Required for the center with a total built surface of 8177.00 m2 (between levels -3 to 3 ª), highlighting and with special interest and study the pool.

Complying with the depths and surfaces necessary for courses, practices or activities of the center, the pool is designed in stages as follows:

A first level of depth between 0 and 4 m of 1219.92 m3. A second level of 4-12 m deep with an area of 1823.84 m3. A third level of 12-19 m depth of 927.86 m3. And finally the deepest area of the pool between 19 and 29 m with an area of 282.70 m3.

Getting well, functional architectural design, covering all needs in terms of dependencies and zoning stays the center, always following a line of elegant, tranparente for its simplicity and studied in detail.