"25 years of projects in Andorra
architecture, engineering and urban planning"

Engineering Projects: Eixampla i Rectificació C.G. núm. 3 Tram. Serra de Honor

Infrastructure


Place:

La Massana (Principat d'Andorra)


Date: 2003-2007
Eixampla i Rectificació C.G. núm. 3 Tram. Serra de Honor, Engineering (Principality of Andorra)

Eixampla i Rectificació C.G. núm. 3 Tram. Serra de Honor

The overall project involves the widening of the CG3 from the KP 6 +290 6 +530 to PK. In this phase the stretch from the KP 6 +430 6 +525 to PK.

The most significant are: PK PK 6 +495 to 6 +525 anchored concrete wall approx. 8.5 m in height. KP 6 +425 to 6 +465 PK masonry wall approx. 3.3 m height.

The works consist basically in the widening of the CG3 on a stretch of 100 meters, with the execution of the masonry wall and concrete wall anchored.

The different studies carried out are:-Demolition of existing house. Compact-land Excavation / rock in the concrete wall. -Execution of concrete wall, wall anchors and filling.

Finishes sidewalks and pavements in the area of the wall anchor .- compact land Excavation / rock in the area of ​​masonry wall.

Implementation of the masonry wall and filled the wall backfill. -Finish sidewalks and pavements in the area of ​​the masonry wall.

Standard was applied "in Building Steel Structures" NBE EA-95 and also the "Instruction of Structural Concrete" EHE-08.