Engineering Projects: Extension and rectify the C.G. Núm.4 in the area of the Borda del Colat and new bridge over the river Arinsal
Infrastructure
Place:
La Massana
Date: 2013-2016
Extension and rectify the C.G. Núm.4 in the area of the Borda del Colat and new bridge over the river Arinsal
109Architecture projects
20
Single Family House
32
Multifamily Housing
12
Public Amenities
16
Private Equipment
7
Reforms and Sustainability
22
Contests