"25 years of projects in Andorra
architecture, engineering and urban planning"

Engineering Projects: Enllumenat Pùblic Desviació a Encamp Fase 1

Facilities projects


Place:

Encamp (Principat d'Andorra)


Date: 1996-2000
Enllumenat Pùblic Desviació a Encamp Fase 1, Engineering (Principality of Andorra)

Enllumenat Pùblic Desviació a Encamp Fase 1

The works covered by this project are required to carry out diversion facilities Encamp-Zone Phase 1 Mirador de Encamp.

The work ratio is:
- Excavations located in all types of terrain;
- Fills and embankments for the establishment of the platform;
- Field testing of Jet Grouting injections;
- Jet Grouting special foundations;
- Two 8-cell no bridges and reinforced concrete;
- Post tensioned concrete slab panel on site and constructed formwork vain range for the field.
- Retaining walls to support the platform;
- Manholes and drainage tubes;
- Replacement of easements and access;
- Sidewalks. This list is not exhaustive.

The track has a length of 440 m. The cross section of the road consists of a roadway width of 13 m, corresponding to 4.5 m for each direction and a sidewalk of 2.0 m in each direction.

The collection and disposal of water from the road is done drain manholes providing appropriate points. The water from the roadway by vertical pipes leading to low output board.

The factory works included in this project are the concrete walls and bridge KP 0 +862 to PK 1 +204. The shapes and dimensions of these structural elements are defined in detail drawings.

On the coronation of the walls in part on the platform and handrails will be constructed as defined in the plans and the relevant sections sidewalks.

It also made ​​the replacement of all accesses and existing easements in the area, as well as replacement of facilities that are affected.

In the section of slope will be a seed to regenerate the slopes.