Engineering Projects: Improvement of the safety of the data processing center of the plant Business Center 3rd

Facilities projects


Place:

Escaldes-Engordany (Principat d'Andorra)


Date: 2011
Improvement of the safety of the data processing center of the plant Business Center 3rd, Engineering (Principality of Andorra)

Improvement of the safety of the data processing center of the plant Business Center 3rd

This specification determines the set of reform . Facilities of data processing center located in Andbank Scald .
The area affected by the reform is the current CPD located in the 3rd building of business center owned Andbank .

The work is divided into two areas of activity:
On 3rd floor perimeter was performed with a panel coated galvanized steel and finished to protect all CPD with fire resistance . They put fire doors and Repassos the ceiling and floor , leaving all the steps of installation facilities • properly sealed .

CPD physically separated into two rooms by a closure technician , isolated acoustically for the location of the new generator .

I built a platform binds metal support of external units HVAC CPD and oil tank to service the new generator .

To install . Wiring mounted a new general picture of the local technical CPD generator and a new UPS box located on the premises of the UPS .

Also installed a new generator at the plant roof of the building to feed the DPC so that in case of a cut in the power supply by the company.

As for cooling, the cold rooms are rooms in which you want to have a very strict control of temperature and humidity ( climate precision ) . Being some rooms that can be called " critical " planned an air conditioning system fully redundant in terms of both units indoors to outdoors.

For the implementation of fire safety is planned to install a DPC inside the fire extinguishing system for FE-13 gas .