Engineering Projects: Extension and rectify the C.G. Núm.4 in the area of the Borda del Colat and new bridge over the river Arinsal
Infrastructure
Place:
La Massana
Date: 2013-2016
Extension and rectify the C.G. Núm.4 in the area of the Borda del Colat and new bridge over the river Arinsal
113Architecture projects
21
Single Family House
33
Multifamily Housing
13
Public Amenities
16
Private Equipment
8
Reforms and Sustainability
22
Contests